Chemical Energy

Archive

Nucor Gallatin / Danieli orders Chemical Energy System from Inteco PTI

Nucor Gallatin, located in Ghent, KY in conjunction with Danieli Corp. has ordered a complete chemical energy package from Inteco PTI for their new melt shop expansion project. 

 

Read more …

Final Acceptance Received from Nucor Kankakee

INTECO PTI was awarded the contract to install a chemical energy system into the EAF at Nucor Kankakee mid-2018.  The furnace at Nucor Kankakee has never used chemical energy in the EAF. 

Read more …

Nucor Steel Berkeley, SC orders Tundish Preheater CFD study from INTECO PTI

INTECO PTI received the order for a tundish preheater CFD study from Nucor Steel Berkeley in South Carolina.

 

Read more …

Optimus Steel, TX orders new Gas Coupler System from INTECO PTI

INTECO PTI received the order for a ladle Gas Coupling system from Optimus Steel USA (formerly Gerdau Beaumont), TX.

The system will consist of 3 basic (lower) sets for the 1 EAF turret and 2 LRF turrets as well as 6 ladle (upper) sets that will equip the entire ladle fleet in the meltshop. The order includes Engineering, installation supervision and start-up.

 

Read more …

SSAB Mobile, AL orders Carbon Injection revamp from INTECO PTI

SSAB Mobile, AL has awarded INTECO PTI with the revamp of their existing Carbon Injection pressure vessels. The entire package consists of engineering, project management, start up and on-site fabrication and commissioning of the entire pipework, controls and all electrical parts.

 

Read more …